For the crews in the field: find your job, log your units, see your photos, and mark the job done.
Written for a phone — "scroll to…", "tap…" — and short enough to print for the truck folder.
This guide also lives in the app: tap Guides in the top bar any time.
Two things to know from the start:
A unit is always shown as its code and its description together — "P58D — PLACE/CHANGE GRADE OF HAND HOLE". You never need a code from memory: read the words, or type a few letters and let the app find it.
You see what the job covers, not the money — that is deliberate, not a bug. Each unit line shows the quantity allocated to this job — what you are expected to build on it — and what crews have logged. The money side (rates, totals, invoices) and the plan's own arithmetic (still to do, what is left on the project line) belong to the office.
1. What this app is for you
Your projects and your jobs are here, each job showing where it is, what it covers, and the sheet you work from. You use it to record the units you put in (your work log), to post the pictures of what you did, and to say when a job is complete. If you are out of signal, it keeps your work on the phone and sends it the next time you have a connection — you do not have to re-type anything.
2. Find your job
Four ways in — use whichever one matches what you know.
Way 1 — My Jobs (your own list)
Tap Jobs in the top bar.
Tap the My Jobs tab.
(Optional) narrow the list with the All statuses dropdown.
Tap Log work on the job's row to open the job.
Each row shows the job's title and project, Location, the Scheduled day, and its Status — on a phone, swipe a row sideways (the table is wider than the screen) to reach them and the Log work button.
If it says "No jobs assigned to you yet", the job is not assigned to you or your crew — ask your supervisor.
Use it when: it is the start of the day and you want your work, nothing else. (The dashboard's "My work" cards land here too — tap Open My Jobs.)
My Jobs — your crew's jobs; swipe a row sideways for its day, status and Log work button.
Way 2 — the Jobs list and its search box
Tap Jobs in the top bar (the All Jobs tab).
Type into the search box — it reads "Job number (J-000042), title or note" — then tap Search.
Narrow further with the All statuses and All projects dropdowns. Clear empties the search.
The search looks in the job number, the title and the note — and if you type digits, in the app's own job number too ("job 1370").
Use it when: somebody reads you a job number and you need the job fast.
The jobs search — a job number, a title or a note.
Way 3 — the Schedule
Tap Schedule in the top bar (or Jobs then the Calendar tab).
Switch between Week and Month; Today brings you back to this week.
Filter with All projects and All crews to see one crew's week.
Tap a job's colored bar to open that job.
Bars are colored per crew — the legend underneath shows which crew is which. The footer says it plainly: "drag a job to move it (its length stays the same)". On a phone, tap a job to select it, then tap the day to move it there.
Below the calendar, Unscheduled jobs are listed ("drag one onto a day to schedule it").
Use it when: you want to see this week at a glance, or which crew is where.
Moving work around the calendar is a scheduling decision — check with the office before you move somebody else's job.
The Schedule week view — tap a job's bar to open it; colors are per crew.
Way 4 — through the project
Tap Projects in the top bar.
Tap the project's name — or its number; both open it.
Tap the Jobs tab.
Finding it fast: the Projects list's search box takes the project's Number, its Name or the customer's own Customer Project Number, and the Number, Name, Customer Project Number, Status and Manager headers sort the list when tapped (tap again to reverse).
You get that project's jobs with their status and team, and a View on calendar button that puts the same list on the calendar.
Use it when: you know the project, not the job name.
A project's Jobs tab — every job on the project, below its map.
What a job page shows
The title and its Status — Assigned, In Progress, On Hold, or Complete — with Edit and On calendar buttons.
Project (tap to open it), Job # (the number the customer uses), Location — tap a site name or a span to open it — Team, and Assigned.
Schedule dates, the job's description, and its GPS when one was recorded.
A map of the spot (or of the span the job runs along).
Then the cards, top to bottom: Job information (your pictures and updates), Units, Workprint, Log units used, and the Work log table.
The top of a job page — status, project, location and team.
Units on the job
The Units card lists the unit lines the job works from — the unit code and its description together — each line showing what the job covers and what is done: Allocated to this job, how many units were set aside for this job on that line (your expectation of the work — a 51-foot bore shows 51.0), and Logged, how much of each line crews have already recorded.
A unit line can carry a note from the office — that unit's own words — shown right under its Allocated to this job figure. The one you will meet is the adder note: some work is billed with added units on top of the normal one (cobble or solid rock met on a bore, for example), and the note on that line names the adders to use. Read it before you log — the job page tells you which adders apply, so it is never a code to remember.
The office's arithmetic around those two figures — what is still to do, what is left on the project line, the revised budget figures and the progress bar — is kept off the crew's view on purpose: it is your construction supervisor's and the office's, the same way the prices are. You see what the job covers; reconciling the plan is theirs.
The Units card as a crew member sees it — each unit line with what is allocated to this job and what you have logged.
3. Log your units
Two ways to record units. Both land in the same place — the job's Work log.
The full way: mark up the drawing
Use this whenever the job works from a workprint sheet — your units end up tied to the line you built.
Open the job (any way above).
Scroll to the Workprint card and tap Mark up on the sheet card. (If the card reads "not attached yet", ask the office — these are the one or two plan pages your job works from.)
Draw what was actually built: tap Draw (freehand) or Draw line. Move / zoom pinches in on a detail — switch back when you are done. Note, Erase, Undo and Clear work the way they sound.
Scroll down to Units performed. Each unit the job carries is a card of its own — code and description together, with Allocated (what is expected on that line) and its Logged figure beside it. Type today's count into Today.
Tap On line and pick the drawn line those units came from.
Add a Note if there is something to say ("placed under road").
Two rows of the same unit (two bores between two vaults)? Tap + Add additional line and fill the new row the same way.
Work the plan does not list? Use the Additional units section: pick the unit in the Unit dropdown (each option is marked on budget or not on budget), or choose "Additional work not allocated to job" and write what you did in What was the work? — with that choice, the note is required too.
Want a picture with a line? Tap Add photo on that unit's card.
When the drawing is finished, tap Save and Submit (the dark button). It hands the drawing and its units to your supervisor in one press. Save as DRAFT saves without submitting — for when you are still working on the canvas.
Is this the last work on the job? Tick This is the last work on this job — mark it complete when this log is approved above the buttons — when the log is approved through the review chain, the job moves to Complete by itself.
Units performed on the markup screen — Allocated, Logged, and the Today box to fill in.The markup save area — the finishing box above Save and Submit.
No signal while marking up? Keep going. Your drawing and its units are kept on the phone — the page says so ("No route to the office — your work is kept on this phone…") — and they send themselves when you are back on the office network. You can close the page. Photos cannot wait like that: add them when you have a connection.
The quick way: the unit log on the job page
Use this for a single unit, when there is no drawing to mark up.
Open the job and scroll to Log units used.
Tap the Unit line box. A "Type to find the work…" box sits above the list — type a few letters of the code or the words, then tap the unit. Every option reads code and description together.
The list is grouped: Allocated to this job first, then the project's other budgeted units under On this project's budget — not allocated to this job, then the rate card's units the budget does not carry under Other rate-card units — not on the budget — each group header counts its options — and last the one choice that is not a unit: "Additional work not allocated to job".
Type the amount into Qty used.
Leave Date worked as today unless the work happened another day.
Write a Note (required if you chose "Additional work not allocated to job" — with the quantity, that is all the record holds).
Is this the last work on the job? Tick This is the last work on this job — mark it complete when this log is approved — when the log is approved through the review chain, the job moves to Complete by itself.
Optional: the Photos box takes pictures for this entry — that needs a connection, so add them later if you are offline.
Tap Log units.
If there is no connection you will see "No connection — these units are kept and will send themselves. Photos need a connection, so add them when you are back." That is the app keeping your work, not an error.
The unit log alone — the unit picker; type a few letters to find the work.Out of signal — the banner says how many saves the phone is holding for you.
What happens next
Your entry appears in the job's Work log table, with a status pill.
Units logged with the unit log start at needs review. Units that come with a redline wait as draft until you tap Submit — in the Work log table on the job page, or "Submit v… for approval" on the sheet screen.
Your construction supervisor clears it first; then the final approver releases it. Once it reads ready to bill, the office can put it on an invoice.
If something is wrong, the entry comes back with the reason — fix it and submit again.
You see units, not dollars. Once it is invoiced, the billing trail is still visible, but prices and totals never show for your role — deliberate, so the field tool stays about work.
4. See photos
The job's own photos (before / after / other)
Open the job. The Job information card has three boxes: Before pictures, After pictures and Any other photos. Each one takes as many pictures as you need.
One Photo caption (optional) covers every picture in that update.
GPS is optional — type the numbers, or tick Use my current location.
Tap Post update. Your update appears in the Timeline below, its pictures labelled Before or After, and any GPS gets an "open the spot" link.
The update box — Before, After and Any other pictures, plus the complete box.
The project's Photos tab (the Solocator map)
Open the project and tap the Photos tab (Site photos).
Every pin is one photo taken with the Solocator app. Tap a pin for the picture, its note, when it was taken — plus Open full image and Open in SharePoint links.
Photos without a location cannot be pinned, and the page says how many. New photos take a little while to appear — they flow in from SharePoint on a timer.
Looking for one picture? Type a word of its note (like "bathroom") or part of its street (like "36th st") into the search box — the map and the list under it narrow to the matches, and the count beside Site photos says how many photos match. Clear shows everything again.
The habit that makes this work: when you save a Solocator folder, name it exactly as the project name you use on your timecard (for example "Hyak-P000074") — the same name for everyone on the job, so all the photos land in one folder, and the folder name is what ties the photos to the project. A close name gets the office a one-click suggestion; a name of your own invention waits on a person.
New phone, or setting Solocator up for the first time? The one-time setup — OneDrive, the Solocator Photos folder, and the filename fields — is step by step on the Guides page, in Solocator — Cloud Save Setup.
The project Photos tab — tap a pin for the picture, its note and its date.
Photos on a workprint line
On the markup screen, Add photo on a unit's card keeps a picture with that line — the strip under the card shows what is attached, and the picture travels with those units.
5. Mark a job complete
Open the job and fill in the update as usual — a comment and any final pictures in Job information.
Before tapping Post update, tick the Mark this job complete box.
Tap Post update. The job's status becomes Complete.
Posting an update on an Assigned job (box unticked) moves it to In Progress — that is the app noticing the work has started, nothing more.
Ticked it by mistake? Tell the office — the status is theirs to change back.
6. If something looks wrong
"… saves on this phone have not reached the office yet…" — a note at the top of every page. Your entries are safe on the phone and send themselves, oldest first, as soon as there is a connection (the app retries every 15 seconds and whenever you open it). Keep working; do not re-enter the same units.
"One save was NOT kept — the server refused it (…)" — this one needs you. It says why; fix it and enter it again.
"No connection — these units are kept and will send themselves." — normal in a dead zone. Nothing to do.
Your job is not on My Jobs — it may not be assigned to you or your crew yet. Ask your supervisor; jobs with no crew show on the office dashboard.
Who clears your units? Your construction supervisor, then the final approver. Your part ends when you tap Submit — or Save and Submit on the markup screen.
The plan's arithmetic is not on your screen — what is still to do, what is left on the project line and the revised budget figures are your supervisor's and the office's, and reconciling the plan is theirs. What the job covers — each line's allocated quantity — you do see.
A photo is not on the Photos tab — give it a few minutes, and check the Solocator folder is named exactly as the project name on your timecard.
Where to ask: the office. Project names, workprints and budget questions — a project manager. Review questions — your supervisor.